PETROLA ELEYSINAS REFINERY- ΕΥΡΩΚΑΤ ΑΕ
Cable Installation (N2XSY 3×300 mm2) length 2,5 Km to upgrade the internal network of the refinery, construction of the necessary lines connections above cable terminal box construction, etc.
ROBA CHANIA WIND PARK- VESTAS
Network installation of medium voltage and construction of control box and straight connections MV.
DIDIMON ARGOLIDAS WIND PARK- ΚΡΗΣΤΩΡ ΑΤΕ
Network installation of medium voltage and construction of control box and straight connections MV.
VIOTIA WIND PARK- ΚΡΗΣΤΩΡ ΑΤΕ- VESTAS
Installation of a network segment and construction of medium voltage control box and straight connections MV.