VOIOTIA AND EVIA COUNTY- INTRAKAT- HOL
Construction of infrastructure of an optical network with length of 60 Km.
INTRAKAT-HOL-VODAFONE
Construction of infrastructure and optic telephone network with total length of 200 Km throughout Greek territory.
VIOTIA WIND PARK- KRISTOR ATE- VESTAS
Construction of infrastructure of an optical network with length of 20 Km.
VIOTIA AND EVIA COUNTY-INTRAKAT-HOL
Blown fiber optic cable with length 200 Km.
FIOTIDA, KARDITSA AND TRIKALA COUNTY- INTRAKAT- DEPA
Blown fiber optic cable length 80 Km along with the gas pipeline.
VIOTIA WIND PARK- KRISTOR ATE- VESTAS
Blown fiber optic cable with length 20 Km.
VOIOTIA AND EVIA COUNTY- INTRAKAT- HOL
VIOTIA WIND PARK- KRISTOR ATE- VESTAS
Installation of fiber optic drop cable with length 10 Km.