The company

The company ENERKAT Ltd. operates in the electrical construction from middle season of 2004, building energy networks and substation medium voltage 20 KV buildings, large shopping centers and wind farms as well as dealing with the construction of photovoltaic systems in land and roofs.

Our company has currently employed 26 people, including three engineers, two people in the accounting department, one person in customer service, two foremen, two truck drivers, two machine operators and 14 electricians – laborers. The people involved in the company “ENERKAT Ltd.” before its creation have joined built the following projects:

ATHENS UNDERGROUND- OLYMPIC UNDERGROUND(1994-1999)

Construction and supervision of the operation of electrical installations for the construction of civil engineering underground work stations.

ATHENS UNDERGROUND- OLYMPIC UNDERGROUND(1999-2000)

Supervision during the construction of permanent electrical installations stations and infrastructure project.

ATHENS UNDERGROUND- Κ/Ξ ΑΕΓΕΚ-ΑΚΤΩΡ-SELI-ΑΒΑΞ (2000-2004)

Monitoring construction, delivery, installation and supervision of operation of tunnel boring machine TBM-cutting.
OAKA permanent installations- TERNA ATE (2003-2004)

Supervision and construction of 22 Km portion of the underground network MV OAKA (cable N2XSY 3×300 mm2), construction of the necessary direct connection of said cable, construction and connection terminal box at entrance PPC OAKA (substations K1, K2, K3) and ten distribution substations in the Olympic Stadium as well as power management of the entire complex (OAKA, IBC, MBC, “CEREMONY SERVICES OLYMPIC GAMES”).

OAKA << Athens 2004- Services on the ceremony of Olympic Games 2004>> -AKTOR ATE (2004)

Installation and assembly of 33 Outdoor & Prefabricated Substations Distribution (supply PPC), as well as construction of the required terminal box cable network feed of these substations.

AIGALEO UNDERGROUND- AKTOR ATE

Construction of worksite installations (substations installations and medium voltage networks) and power management.
The Vehicles – tools we have in our possession are:

  • 3 Trucks MERCEDES, 2 geraniums.
  • 2 loaders BOB CAT S330, MUSTANG
  • 1 Tsapaki ?? BOB CAT 323
  • 3 vehicles MITSUBISHI L200, L300
  • 2 vehicles MERCEDES SPRINTER
  • 1 NISSAN PICK UP
  • 1 ASFALTOKOPTIS VERDINI DL10
  • 1 COMPRESSOR C38GS DTL 0407
  • 1 INSTITUTION SYGKOLISIS OPTICAL FIBRE FUJICURA
  • 1 AVLAKOTIRAS? – WHEEL SIMEX T600-100mm
  • 1 AVLAKOTIRAS? – WHEEL SIMEX T600-200mm
  • 1 HYDRAULIC CRUSHING PLANT

The heart of our philosophy and the key pillar around which we plan and organize all our work is the satisfaction of our customers. We constantly seek to develop and foster relations of mutual respect with you, working methodically to fully cope with the arising needs and requirements.