Κτηριακές εγκαταστάσεις - enerkat
309
page-template-default,page,page-id-309,cookies-not-set,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,qode-content-sidebar-responsive,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-5.0.1,vc_responsive
 

Building Installations

ATHENS ARENA- CONSPEL ATE (4.000 KVA)(4.000KVA)
Construction of electricity, medium voltage substation construction (construction of foundational grounding system, installation of equipment, installation and cable connection of medium and low voltage), power management.

APROPIRGOS MERCEDES BUILDING- EUROMIXANIKI AE (800 KVA)
Substation construction of medium voltage (installation of equipment, installation and cable connection of medium and low voltage), power management.

PARNITHA OTE WAREHOUSES- INTRAKAT (2.000 KVA)
MV substation construction (construction of system grounding, installation of equipment, installation and cable connection of medium and low voltage), power management.

LAKIS GAVALAS- PAIANIA- INTRAKAT (2000 KVA)
Substation construction of medium voltage (installation of equipment, installation and cable connection of medium and low voltage), power management

DATA CENTER HOL- ATHENS- INTRAKAT (2.630 KVA)
MV substation construction (installation of equipment, installation and cable connection of medium and low voltage), placement / G, UPS, equipment DATA CENTER, power management.

ETHNIKI BANK DATA CENTER- NAYTILOS (4.000 KVA)
MV substation construction (installation of equipment, installation and cable connection medium and low voltage), placement / G, UPS, equipment DATA CENTER, power management.

THE MALL ATHENS- LAMDA DEVELOPMENT (12.000 KVA)
Construction of electricity, medium voltage substations (installation equipment, installation and cable connection of medium and low voltage), power management.

THE MALL ATHENS- LAMDA DEVELOPMENT
Construction of a System with 210 intermediate measurement standards of PPC(ΔΕΗ)

GOLDEN HALL- LAMDA DOMI (18.500 KVA)
Construction of infrastructure and network electricity, construction of a new intranet of medium voltage and power management.

GOLDEN HALL- LAMDA DOMI
Construction of a System with 170 intermediate measurement standards of PPC.

GOLDEN HALL- LAMDA DOMI- (SITHIA INSTALLATION 2X1000 KVA)
Design and construction of network and medium voltage substations, design manufacture and installation of tables and low-voltage network, design and construction of control system and power management.

ATHENS HART- TERNA ATE (8.000 KVA)
Construction of electricity spaces, construction of a control box, power management.

ATHENS HART- TERNA ATE
Construction of a System with 80 intermediate measurement standards of PPC.

PANTHEON PLAZA- LARISA- SONAE SIERA (5.000 KVA)
Construction of medium voltage substations (installation of equipment, installation and connection of a cable with medium and low voltage), power management.

PANTHEON PLAZA- LARISA- SONAE SIERA
Construction of a System with 117 intermediate measurement standards of PPC.
Design, manufacture and installation of substations and areas of low and medium voltage into several smaller private projects.